YUEQING HAIDIE ELECTRIC CO.,LTD
|
Place of Origin: | Zhejiang, China (Mainland) |
![]() |
|
Add to My Favorites | |
HiSupplier Escrow |
Receptacle - 3 Way Black Sealed Female Connector Assembly part of 15336029
Then there is the pre-installation process; first, work out pre-installation processing instructions, in order to improve final assembly efficiency, complex wiring harness are to be set up with pre-installation stations, the reasonability of pre-installation process is directly connected to the final assembly efficiency and the technical ability of processing staff. If the assembling in pre-installation stage is not enough or the wire route assembled is not rational, the workload of the general assembly staff will increase and the assembly line speed will reduce, therefore, processing staff need to stay on the site often and conclude.
In addition, the wire harness processing also includes making of the material consumption quota list, task hour estimation and staff training. As the technical is not high enough, this needs no further explanation. In a word, technological content and quality of automobile wiring harness has gradually become one important index when it comes to automotive performance evaluation. Automobile enterprises should pay much attention to the selection of wiring harness, and it is necessary to know processing and production of automobile wiring harness.
Product Description
Product name | Automotive Connector |
Material |
Housing:PBT+G,PA66+GF; Terminal:Copper Alloy/Brass/Phosphor Bronze. |
Operating Temperature range | -40~120 |
Function | Replacement for Original Brand Cars |
MOQ | Small order can be accepted |
Delivery Time | Enough stock and strong production capacity ensure delivery time |
The last step is the assembly process. Tooling equipment and material box size need to be designed according to assembling platen designed by product development department and stick all the assembly sleeve and accessories on the material box to improve assembly efficiency. Prepare the contents and requirements of each work station, balance all the assembly work stations in case situation of certain workload is so large that
the whole flow line speed is dragged may occur. Achieve station balance, processing staff ought to be very familiar with every operation and task hours should be counted on site, assembly processing needs to be adjusted at any time.